The O&M manuals are a folder of PDFs.
Thousands of pages, and the warranty that matters is on page 412.
We turn your as-built BIM model into a digital twin your facilities team works in every day: sensors on the rooms, risers and plant they measure, work orders on the assets they fix, and a monthly report on energy, comfort and maintenance against target. Joined to your CAFM, run to ISO 41001 and ISO 19650-3.
A digital twin is a live model of a building that joins its BIM model to sensor data and maintenance records. AIM United builds twins from BIM and laser scans, connects the sensors and links each asset to its work orders, so your facilities team runs the building from one model. We deliver digital twins in Saudi Arabia, the UAE and the GCC, and hold ISO 41001 for facility management.
Thousands of pages, and the warranty that matters is on page 412.
So the alarm, the work order and the energy use tell three different stories.
The floor has been warm for an hour before anyone calls the helpdesk.
Spreadsheets from five teams, and the numbers still disagree.
Tower T01: ten storeys of offices on a two-level podium in Jeddah, with a double-height lobby, a parking deck with EV charging and a roof plant deck. 69 sensors: temperature and CO₂ in the offices and meeting rooms, people counters at the entrance gates and in the rooms, a sub-meter on every floor's distribution board, water meters and leak sensors in the plant room and the toilet cores, the chillers, cooling towers, pumps, AHUs and PV on the roof, the four lifts in the core and the fire alarm panel. Drag to peel the floors; tap a sensor for its reading, its trend, its asset and its work orders.
The values follow a Sunday at 12 minutes a second. Asset links, space names and tags come from the COBie data handed over with the as-built model; the sensors, their BMS points and their alarm rules are our IoT & Smart Buildings service.
The floors drawn apart, each room coloured by what its sensors say now. Watch the morning arrive, the west offices warm up in the afternoon sun, and the upper floors drift out of band when AHU-02 starts to struggle at 13:50, before anyone calls the helpdesk.
At 13:50 the supply air from AHU-02 climbs past its limit. The rule waits ten minutes to be sure, then raises the work order in the CAFM with the asset, its location, its warranty and its history attached. Follow it to close-out, with the attendance and fix times counted against the SLA.
The sensors, points and alarm rules behind this work order are set up by our IoT & Smart Buildings team; the asset record comes from As-built & Handover.
Desk and room bookings set against what the people counters and room sensors measured, floor by floor, through the week. Bookings nobody turns up for are released after 15 minutes, and floors that stay quiet can be consolidated, cooled less or let.
One report for the owner and the FM team, from the same data: energy against the adjusted baseline, comfort hours, work orders closed within SLA, planned maintenance done and the availability of the critical plant. Pick a measure to see it floor by floor on the model.
Energy is metered and compared with a baseline adjusted for weather and occupancy (IPMVP Option C). Comfort hours count occupied hours with the zone in its band. SLA counts reactive work orders attended and fixed within the times for their priority.
ISO 41001AIM United is certified to ISO 41001:2018 for facility management and to ISO 19650 for information management: the twin runs on the same processes we use for operations.
The as-built model and its COBie data become the twin: spaces, assets, systems and zones, checked against your AIR. Validation report.
Assets, locations, work orders and PPM kept in step, both ways, with the CAFM you run, or one we set up with you.
Which alarm raises which work order, for whom, at which priority and SLA, and how it closes with evidence.
PPM schedules per asset from the O&M data and the manufacturer, with compliance tracked every month.
Bookings against measured use, room by room, with the reports behind consolidation and fit-out decisions.
Sub-metered energy against an adjusted baseline, comfort hours and SLA, in one monthly report in English or Arabic.
Condition, warranty, expected life and replacement planning per asset, kept current by every work order.
Your FM team trained on the twin, our FM engineers on call, and the twin kept up to date as the building changes.
For an owner and an FM team, a digital twin answers three questions every day: is the building comfortable and safe, how much energy is it using, and what needs fixing before it fails. It does that by putting the live data and the maintenance records on the model the building was built from, so every alarm, work order and report points at a real room or a real asset.
On Saudi giga-projects and government buildings, owners increasingly ask for an asset information model at handover, to ISO 19650-3 and their own asset information requirements. The twin is where that model goes to work: the COBie data from the as-built becomes the asset register in the CAFM, the BMS points from the IoT layer are tied to the same assets, and the FM team runs operations, maintenance and reporting from one place.
| Standard | What it asks | Where it shows |
|---|---|---|
| ISO 41001 | A facility management system: policy, objectives, processes, and performance measured and reviewed. | The monthly report |
| ISO 19650-3 | Information management in the operational phase: the asset information model and the requirements it meets. | The twin's data |
| COBie | The handover format for spaces, assets, types, systems, documents and warranties. | The asset on every sensor |
| ISO 55001 | Asset management: lifecycle decisions from condition, risk and performance. | Asset history and warranty |
| IPMVP | Measuring energy savings against a baseline adjusted for weather and use. | Energy against baseline |
Engineers across BIM, MEP and facility management, so the model, the asset data and the operations come from one team.
Certified for facility management, alongside ISO 19650 for information management and ISO 9001, ISO 14001 and ISO 45001.
Of our projects are for returning customers, who stay with us from the first model into operation.
LOD 500 · COBieWe model buildings to LOD 500, deliver the COBie data at handover and run facility management services, so the twin starts from data we checked ourselves.
The as-built model, COBie data, O&M manuals, the asset register and the BMS points list, checked against your AIR.
Spaces, assets and systems set up in the twin, with names and tags that match the CAFM and the BMS.
CAFM, BMS, meters, bookings and access control joined, and the alarm-to-work-order rules agreed with your FM team.
Your team runs work orders, PPM and space from the model, with our FM engineers alongside in the first months.
A monthly report against target, and a quarterly review of the rules, the SLAs and the asset plan.
A digital twin is a live model of a building: its BIM model joined to the sensor data, the asset records and the maintenance history. AIM United builds twins from the as-built model and its COBie data, links each sensor to the room or asset it measures and each work order to the asset it fixes, so the facilities team runs the building from one model.
The BMS controls the plant and raises alarms. The twin sits above it: it puts the BMS points on the model with the asset records, turns alarms into work orders in the CAFM, and reports comfort, energy and maintenance against target. The BMS keeps controlling; the twin is where the FM team works.
Our IoT & Smart Buildings service designs and commissions the sensors, the BMS points, the BACnet integration and the alarm rules. This service runs the building on top of them: work orders, planned maintenance, space and occupancy, energy and performance reporting and the asset lifecycle.
No. We integrate with the CAFM or IWMS you already run, so work orders, PPM schedules and the asset register stay where your team works. If you have none, we set one up with you and load it from the as-built data.
The as-built model, the COBie data (spaces, assets, types, systems, documents and warranties), the O&M manuals and the BMS points list, checked against your asset information requirements under ISO 19650-3. Where something is missing, we capture it on site.
ISO 41001 is the international standard for facility management systems: policy, objectives, processes and performance that is measured and reviewed. AIM United is certified to ISO 41001:2018, and the twin's work-order rules, SLAs and monthly report follow the same processes.
Yes. Each alarm rule names the asset, the priority, the team and the SLA. When the rule holds, the work order is raised in the CAFM with the asset's location, warranty and history attached, and it closes with the evidence: photos, parts and time on the asset record.
Against a baseline adjusted for weather and occupancy, following IPMVP Option C with metered data. Sub-meters on each floor and on the plant show where the energy goes, so a saving can be traced to the floor or the system that made it.
Yes. We laser-scan the building, model it in Revit from the point cloud and collect the asset data on site, then build the twin from that model. See our 3D Laser Scanning & Scan to BIM service.
Room and desk bookings are set against what people counters and room sensors measure. The report shows booked against used for every floor and room, the bookings released because nobody arrived, and which floors could be consolidated.
Yes. The monthly report and the dashboards are available in English and Arabic, from the same data.
You do. We agree at the start where the data is hosted, who can access it and how it is exported, so it stays usable if the platform or the service provider changes.