01Contractor PM
Clashes found on site
A duct meets a beam after the ceiling grid is up. Rework, a variation claim and a week off the programme.
"Approved shop drawings on time. Fewer clashes on site. Less rework."
Engineering · BIM, coordination and design
We model to LOD 100–500, clear the clashes, check the structure, then generate the sheets and quantities from the same model. Our own tools do the repetitive part.
An envelope and analytical lines: where the column and beams go, not their size.
Used for · Concept design, early cost
BIM coordination combines the architecture, structure and MEP models into one federated model and resolves the clashes before work reaches site. AIM United runs clash detection in Navisworks, sends each clash to the team that owns it and takes quantities from the coordinated model. We coordinate projects in Saudi Arabia, the UAE and the GCC.
Most delivery teams still keep the model, the shop drawings and the quantities in separate hands. Every revision has to be carried across by people. That is where clashes slip through and margins leak.
01Contractor PM
A duct meets a beam after the ceiling grid is up. Rework, a variation claim and a week off the programme.
"Approved shop drawings on time. Fewer clashes on site. Less rework."
02Technical Director
Sets go out with missing views and duplicate names. Errors surface only at client review.
"Automation output needs as much checking as manual work."
03BIM Manager
A package lands and the team is already full. Outsourced models come back off the BEP, with coordinate problems to fix.
"External modellers won't follow our BEP."
04Commercial / QS
The BOQ is taken off PDFs, so it drifts from the model the moment the design moves.
"Which revision was this measured from?"
of all construction rework in 2020 was caused by bad data: inaccurate, incomplete or inaccessible project information.
Source: Autodesk and FMI, Harnessing the Data Advantage in Construction, 2021Stage 02 · Coordinate
Services are tested against structure level by level. Click each clash to resolve it.
Stage 03 · Generate
Slab, rebar, steel and MEP sheets, plus the quantity take-off, all generated from the coordinated model. Change the model, and they regenerate.
Scroll to generate the set.
Stage 04 · Check
Scroll, drag the cut handle or use the slider, and orbit the model to read the hatched section. The readout checks beam L02 on grid 2 at the cut.
Check basis: simply supported bays, 1.2G + 1.6Q, C40 concrete, 400 × 750 beam. Project design follows the code your client specifies (for example ACI 318, BS EN 1992 or SBC 304) and is signed off by a qualified engineer.
Take one, or take the chain. Each works inside your BEP, your templates and your CDE, and each hands the next one a model it can trust.
Architecture, structure and MEP, modelled to the LOD your EIR asks for.
Hard, clearance and workflow clashes, tested by level and zone on a weekly cycle.
Analysis models, member design and checks for RC and steel, to the code your client specifies.
Slab, rebar, steel and MEP shop drawings, generated from the coordinated model on your title blocks.
Quantities tied to model element IDs, so they update when the model does.
Quantities from AIM United's own project record in KSA. Each row names the project it comes from.
On government-funded projects, EXPRO's National Manual for Project Management requires design data and drawings to come from 3D models, a BIM Manager on large projects and COBie data in IFC. Giga-projects set their own BIM requirements in their EIRs and contracts.
Source: EXPRO, Project Automation Requirements and Deliverables Guideline (EPM-KE0-GL-000020), 2021of all construction rework in 2020 was caused by bad data, worth $88.69bn. A model that drives the drawings and quantities takes one source of that out.
Source: Autodesk and FMI, Harnessing the Data Advantage in Construction, 2021Engineering, with direction. Five steps, the same on a single slab package or a full tower. We start with a paid pilot: one level, one system, fixed fee.
Your EIR, BEP, design drawings, templates and, for existing buildings, the site scan.
Scope, LOD matrix, programme
Discipline models to the agreed LOD, on your templates, with health checks at every drop.
RVT / IFC, health report
Clash tests, structural checks, sheet generation, schedules and take-off run from our own tools.
Clash register, calcs, sheets, QTO
Issued into your CDE (ACC, Aconex or ProjectWise), on your title blocks and naming.
DWG, PDF, NWD, BCF, XLSX
RFIs, revisions and site changes go into the model, and the set regenerates. As-built to LOD 500.
Revisions, as-built model
LOD 300 is precise geometry: size, shape and location you can coordinate against. LOD 400 adds fabrication detail such as rebar, connections and hangers, enough to produce shop drawings. LOD 500 is field-verified: the model matches what was built. We agree an LOD per element category before modelling starts.
Coordination brings the discipline models together and tests them for hard clashes, clearance clashes and sequencing problems before anything is built. The appointment decides who pays: usually the main contractor or the lead consultant. Either way it costs far less to move a duct in the model than on site.
Native RVT on your Revit version, IFC 2x3 or IFC 4, NWC and NWD for Navisworks, BCF for issues, DWG and PDF sheet sets on your title blocks, and XLSX for bar bending schedules and quantities. We match the naming and folder structure in your BEP.
Shop drawings show how an element will be made and installed: bar shapes, connection plates, service routes. They are issued before construction for approval. As-built drawings record what was actually built, after construction. We produce both, and keep them tied to the same model.
For government-funded projects, EXPRO's National Manual for Project Management requires 3D-model-based design data, a BIM Manager on large projects and COBie data in IFC. On giga-projects the binding requirement is the client's EIR and contract. We model to it, and AIM United is certified to ISO 19650.
Yes. We work to the EIR and BEP your client issues, with ISO 19650 naming and information containers, inside the client's CDE. We start with a pilot package so your BIM lead can check the output against their standards before we scale.
A paid pilot: one level, one system, fixed fee, credited against the full order if you go ahead. You get the model, the clash register, the sheets and the quantities.
Tell us about the package. An engineer replies, not a salesperson.