LOD 300 in the contract, LOD 200 in the model.
Nobody wrote down which element needs which level, so nobody can check it.
We model architecture, structure and MEP from the first massing to the field-verified as-built, and issue the shop drawings straight from the LOD 400 model.
Level of development (LOD) states how complete and reliable each element of a BIM model is, from LOD 100 massing to the LOD 500 field-verified as-built. AIM United models architecture, structure and MEP at every level and issues shop drawings from the LOD 400 model. We deliver BIM modelling and shop drawings for projects in Saudi Arabia, the UAE and the GCC.
Nobody wrote down which element needs which level, so nobody can check it.
The duct meets the beam after both are installed, not in the federated model.
The sheets drift from the model with every revision, and the workshop builds the wrong one.
Fittings, hangers and supports were never modelled, so the site improvises them.
Nothing was checked against the building, and the asset data is a spreadsheet nobody owns.
Detail, development, information: the same three letters, three meanings, one dispute.
Drag to turn · Ctrl + scroll or pinch to zoom
Pick a discipline and two levels. Drag the split to wipe from one to the other, element by element.
Every element has two halves: the geometry you can see, and the information attached to it. Both grow with the level: each step adds the parameters the next use needs.
Geometry
Used for
Properties follow the ISO 19650 level of information need (ISO 7817-1, EN 17412-1) and IFC 4 property sets, with COBie at handover. Values shown are for a typical office building.
Tip: tap the element itself on the model.
A plan cut drops through the floors; a section box isolates one zone. Drag the yellow handles on the model, or use the sliders, and the cut moves through the building.
Drag the model to turn it. Drag a yellow handle to move that face of the cut.
A congested corridor ceiling: a downstand beam, the supply duct, chilled-water flow and return, a sprinkler main and a cable tray. At LOD 300 the services are generic and run straight through each other. At LOD 400 they are routed, fitted, insulated and hung.
Drag to turn the void. Drag the divider to wipe between the two levels.
| Level | The model | ARCH deliverables | STR deliverables | MEP deliverables |
|---|
Slab layouts, rebar, steel connections and MEP spools are cut from the LOD 400 model. Change the model, and every sheet that shows it updates.
The level of information need is set in the EIR and BIM execution plan, element by element, before anyone models.
Each level is defined per element, for geometry and for attached information, so "LOD 350 duct" means the same thing to everyone.
Models and sheets move through the CDE states, and only checked work is shared or published.
Engineers on the team, across architecture, structure and MEP.
Buildings in the MEP BIM model for Six Flags Qiddiya.
Modelled from LOD 300 to LOD 500 for Lucid Motors at KAEC.
We map your EIR and BEP to a level for every element and discipline, per stage.
Architecture, structure and MEP in Revit, to shared templates and parameters.
Federated in Navisworks. Clashes are tracked to closure, with a report each cycle.
Shop drawings, rebar and spools issued from the model through the CDE.
Field-verified as-built model and drawings, with COBie asset data for FM.
Level of development: how far you can rely on an element's geometry and the information attached to it. LOD 100 is a massing concept; LOD 500 is a field-verified as-built. Each element in a model can sit at a different level.
LOD 350 adds the interfaces: connections, hangers, supports and clearances between systems, so the model can be coordinated. LOD 400 adds what the workshop needs: fittings, joints, rebar, spools and support details, so the element can be fabricated and installed.
LOD 400 for the elements being fabricated: rebar, steel connections, duct and pipe spools, cable tray supports. The rest of the model can stay at LOD 350 as long as it is coordinated.
Not necessarily. LOD 500 is about verification, not more geometry: the model is checked against what was built and carries the asset data that facility management needs.
The appointing party, through the EIR and the level of information need. We turn it into an element-by-element LOD matrix in the BIM execution plan, so every party models and checks to the same table.
Autodesk Revit for modelling, Navisworks Manage for coordination and Autodesk Construction Cloud as the CDE. We export IFC when the project asks for open formats.